Sunday, December 14, 2014

New and refinished

Another new addition to the collection of work. This little one is fabricated from reclaimed roofing copper, has three little ball feet and is the first vessel to be formed partially with a pneumatic hammer. Unlike almost all of the vessels I make, this one is constructed of only two pieces of metal. The dark brown patina is an effect of being treated with liver of sulfur. The piece is coated with micro-crystalline wax that is used commonly in sculpture and furniture restoration. 
 Here's a close up of the hammer detail.

I restored this piece after someone dropped and dented it. I wasn't too excited to rework this piece, as it has always been one of my favorites, however, it turned out pretty well. I can't say I'm not happy with the turnout. Like the vessel above, this one is the first and only other to be forged of just two pieces of metal. Instead of taking it apart and working out the dent. I decided to dent the sides all the way around. The existing green patina is still visible as well as the added liver of sulfur (brown) patina. This is still titled "Lichen" because that is what seems appropriate for this vessel. I think of plant forms with this piece and some earlier work. I think I'll have to explore this concept more in the future.


Below: Original design and patination of "Lichen"
Thank you for looking.

Wednesday, December 3, 2014

"This is Temporary"

My newest piece is finally photographed.

I like re-purposing, up-cycling and the like, so it made me think more about how human-made objects are discarded so frequently and yet have so much use left in them. I think there is always more than just one use for anything.

This piece was made from copper grounding wire, an etched copper printing plate, a brass goblet and a brass award plaque.

"This is Temporary"
Forged and fabricated copper and brass.
7 1/2 x 4 1/4 x 4"
2014
$250






I will be trying to slowly change the format of this site so please be patient while I organize my vessels.

Wednesday, November 26, 2014

Holiday Sale

From November 27 until December 8th, 2014 I will be offering a 15% discount on any purchases made from this site. Please contact me via email or phone for purchase details. I will also ship your item(s) for free with this sale. Sale excludes other offers, commission work, and in-gallery purchases.

Happy Holidays!
Adam O.

Monday, November 10, 2014

Happenings at the studio before winter

Welcome, Thanks for reading or at least checking out the pictures. I've been bounced around with work and no work at my "full-time" "big kid job". I left off with introducing you all to the new studio. I have more pictures I'd like to show about the progress. The cold blooded building is still cold blooded and its starting to show its cold side this time of year. The repairs to the building have helped a lot with the heat in the basement. I've piped in some heat from upstairs and have also introduced a few new tools and one helps heat the place up. Along with studio upgrades and tinkering, there is progress on my metalwork as well.



First off, The air compressor that my friends Matt and Jenn Gave me started leaking at the relay switch, so I took apart and the springs flew out and I couldnt get them back together until I already bought the new/used militarty surplus compressor pictured below. Got it locally on craigslist. Its from the 60's or 70's, its much bigger and was quiter with the old one cylinder setup pictured. It took too long to fill so I switched out the two cylinder compressor and motor from the old compressor. There were many unforeseen problems which lead to more swapping of parts and modifications, but it works fine now. 
 So I managed to create my first vessel from within Mjolnir studio I haven't titled it yet but its forged and fabricated copper with green patina and burnishing.

 The Viking/Dragon ship is coming along slowly but surely. There's always a tool or material I have to make or need to order to get much of anything done on it. The hull of the ship is roughly completed. I'm waiting on some casting supplies in order to cast the head and tail. These cast pieces will replace the sheet copper bow and stern. If things go much longer without success I will have to chase and repousse 4 pieces of metal to complete a head and tail for the vessel.

 The keel of a viking ship is the long timber that runs the length of the ship on the bottom. It's what all the side planks of the ship were built off of. It gave good structure to the vessel and yet allowed flexibility to aid in sea voyages. Later on the keel also helped support the mast of the ships through a series of crossbraces.
The keel on my vessel commission was formed using a modified flat-head screwdriver and a vice to support and stretch the metal into shape. 
 Below the sculpting clay version of the dragon head which will be used in the casting process.

 Went to an auction with Lyle a while ago. It was our first auction in which we were bidding. It was a learning experience but I know we did well as we left, we felt like vikings that raided a village and got away with the loot. I Went to the auction for the whole purpose of getting a belt/disc sander. I emptied my bank accounts and went to the auction. Little did we know the auction would start at 9am and we wouldn't get done transporting our spoils to storage and studio until about 6pm. Regardless, all the money I had wasn't enough to get a really cheap camper or oxy-propane torch but I did manage to get the belt-disc sander, and a 390 pound McEnglevan (MIFCO) slot hearth forge and Lyle picked up a next to new lincoln welder and Milwaukee drill. I'd say we did pretty awesome for our first auction. Cant come across deals that good very often. Lots of stuff went for less than scrap prices. Someone got a ~12foot Pittsburgh metal lathe for $120 with all the attachments.
 Even though we're getting low on room in the studio we still had to get the tools and the forge down the steep steps into the basement. The previous owner helped Lyle and I get the forge in the truck with a crane after I took the truck cap off. It took three of us to get it out of the truck and into temporary storage at my garage. So getting it in the truck again and down the into the studio was going to be a big issue. The forge had 2-3" of clearance to make it down and through the basement door.

 Scrap lumber and a leftover I-beam segment from fixing the basement door frame was used in making this 12' long crane rig.

 Got a cheap winch and mounted it in my truck box with metal supports under the box to bolt into. The bed-liner in the truck is there for support because the truck has rust holes. Replacing the crank with my cordless drill made for a quicker loading and unloading operation.
 The winch was used to pull the forge up into the truck on a 4x4 wooden ramp with angle iron guides and bracing in between to eliminate shifting rails and it kept the wheeled base I made for the forge from tracking off the boards. 
 ^ me with the forge.
 Above, the forge is loaded in my truck and the rail is brought with. I made the rail just long enough to fit from the top of the studio stairs to the bottom
Ready to lower it off the truck with the winch and onto the platform to go down. Once off the rail, the rail was moved into the stairwell and screwed into place. Below you see the safety chair and wooden spool, Carefully placed to optimize cushion on impact in case the 398 pound forge decided to take a tumble. It was more of a joke but it might have helped. haha. The stairs are right inline with an old concrete support pillar for the old building. building built in 1865, basement added before 1939 if it wasn't original.
We may have been a little extreme in our safety measures pictured below but we weren't sure how everything was going to go. We prepared... Better to be safe than sorry.

 Planning the function and brainstorming safety issues while drinking.
 Bracing the side of the rig in case it decided to tilt one way or another.
 Very steep stairway. You can see how the wooden rig fit right into the I-beam above the doorway to give it support.


 A big thanks to the lovely Sabrina for photo documentation assistance. :)





 Two wheels over the bump and starting down



 It's a good idea to have something like a rug or blanket over a cable under tension. If it breaks, it gives some wind resistance and weight to slow the cable and hopefully prevent loss of limbs or what-have-you... Lyle below on the load strap keeping the rolling load lined up on track.

 Barely any clearance going through the downstairs door.

 Success!


 I want to give a big thanks to Lyle for helping with this endeavor and Sabrina for bringing snacks and documenting thee process. I want to thank you for checking out my site and I hope you enjoyed it or learned something new.

Best wishes,

Adam O.