I've been hurting for studio time. Working out of a shared space, I ended up having to take time away from my metal projects to remove and replace an engine in a 2000 chevy cavalier for my brother. Thank God it didn't require too much extra time beyond lost bolts and rusted parts. Thankfully it runs and drives great and I can resume building a Viking ship that I have been commissioned to do. I am very eager to get into the "studio" again. I have felt lost without any art to do. It's time to bunker up in the studio and beat some metal before it gets extremely cold out this winter.
I also just updated the "Vessels" page with pricing. Pricing and commission opportunities can be discussed via email found on the contact page.
Thanks for reading. :)
-Adam O.
No comments:
Post a Comment